If there is a stream flowing through the site, can the power be generated from the drop? It's a common idea.In conclusion, it is possible if the conditions are met, but it is more likely that they are not met.The calculation of the necessary drop and flow, the handling of water rights, and the cost estimates are arranged.
Calculation of power generation
First, we estimate how much electricity we can generate. The formula is simple.
Output (W) = 9.8 × flow (m³/s) × effective drop (m) × efficiency
9.8 is the gravitational acceleration. The efficiency is the overall efficiency including the losses of the water wheel, generator and piping.In small‐scale, it is about 0.5 to 0.7.It is realistic to anticipate that 2000-2005 will be the year of the 2005-2006.
Let's actually do the calculation.
This calculator uses the conditions commonly used in mountain streams.
| Conditions | Flow | Gap | Output (efficiency 0.6) |
|---|---|---|---|
| Thin stream | 0.005 m³/s (5 litres/s) | 5m | About 1.5W |
| Narrow stream with drop | 0.005 m³/s | 20m | About 6 W |
| Slightly large stream | 0.02 m³/s (20 litres/s) | 20m | About 24W |
| A smooth flow. | 0.05 m³/s (50 litres/s) | 30m | About 88W |
| It's pretty good. | 0.1 m³/s (100 litres/s) | 50m | About 294W |
I'm sure you've changed your mind when you look at the numbers.
In a stream that flows through the grounds, it is only a few to tens of watts.This is the size of a night lamp, a smartphone charging, and a small sensor device. It's not enough for the refrigerator or air conditioner at all.
But it's going to be 24 hours a day, 365 days a year.
This is the decisive difference with sunlight.
| Small hydraulic power 24W | 24 Watts x 24 hours = 576 Wh/day(If the water volume is stable) |
|---|---|
| Solar panel 200w | The actual power generation depends on the amount of sunlight.Usually 400〜800Wh/day.(It fluctuates greatly according to season and weather) |
A small hydropower plant of 24W generates almost the same amount of solar power as a 200W solar panel.It will be. And it continues to generate electricity even at night and in rainy days, and it does not fall in winter. In snow-covered areas, it is more stable than sunlight.
This "thin and long" property is the essence of small hydropower.
Measuring flow and drop
Flow
You can get a rough idea without any professional measurements.
- Bucket method.Measure the number of seconds a 10-litre bucket is filled at a point where the water from a stream can be collected. If you fill it in five seconds, it's two liters per second.
- Cross section × flow velocity.The flow velocity is measured from the time when the floating object moves 1m.
It is important to measure during the dry season.It is not useful to measure it during the snowmelt period in spring or during the monsoon.The flow rate at the time when there is the least amount of water is the strength of the stream.
Gap
This is the difference in height between the water source and the place where the generator is placed. It's roughly as you can see from the isotherms on the topographic map.In practice, the effective drop is reduced by the friction of the piping.
Because the longer the thin tube is drawn, the greater the loss, the diameter of the tube is thickened if there is a distance.The effective drop is estimated to be 7〜8% of the actual drop.This is the safety side.
What about water rights?
This is the biggest barrier.
As a principle, water retrieval for power generation requires water use permit (power generation water rights) under the river law.The procedures are more complicated than for drinking water and household water.
| Category 1 rivers and category 2 rivers | Permission of the river manager (the state or the prefecture) is required. |
|---|---|
| General purpose rivers | Municipal permits |
| Common rivers (non-legal) | It's outside the scope of the Rivers Act.In this paper, we will discuss the role of the municipality in the development of the urban environment. |
The narrow stream between mountains is usually a normal river, and in this case it depends on the regulations of the municipality.It is not free because it is outside the scope of the river law.
In addition, if there are customary water rights holders downstream, adjustment is necessary. No more details. River law and customary water rights articles Please see the following.
The system of subordinate power generation
In the 2013 amendment of the Rivers Act,Power generation using water such as agricultural water which has already obtained a permit (subordinate power generation) is registered.It has become. It's easier than a permit.
However, this is a system for the case when it is carried out in addition to existing water rights. If you start a new water extraction, you will have to go through the normal permission procedure.
Facilities and costs
| Micro-hydroelectric generators (from tens to hundreds of watts) | It's on the body.100,000 to 500, 000 yen。 The small ones, called pico-hydropower, start at tens of thousands of yen. |
|---|---|
| Water extraction facilities and sedimentation tanks | Tens of thousands to several hundred thousand yen.It is necessary to take measures against the flow of falling leaves and sand. |
| Aqueduct | This is due to the distance and the pipe diameter. It'll be a few hundred thousand. |
| Battery charge controller | The price ranges from 100,000 to 300,010 yen. We're going to have to store the power we're generating. |
| Installation work | If you do it yourself, you only have to pay for the materials. It'll cost hundreds of thousands of yen if you hire a contractor. |
Minimum configuration costs between 300,000 and 1 million yen.This is an approximate value. If the target is the kW class, the scale will be several million yen to tens of millions of yen.
Maintenance is the real problem.
It's not the cost that decides whether or not this will continue.
- The water intake port is blocked.Falling leaves, branches, sand. You have to go there every time it rains.
- Cleaning the screen.And if you leave it alone, it stops generating.
- Water shortage period was stopped.If there 's less water, there is less power.
- Freeze.In cold regions, we have to prepare for winter.
- Damage during water increase.Sometimes the water supply is flooded.
It's not something that you can leave there and it will continue to generate electricity.Think about it as if you're doing it regularly.
Can we sell electricity?
It is possible to be subject to FIT (fixed price purchase system), but,It is not realistic for an individual to sell electricity for tens of watts.
- The cost of the connection works to the grid is not commensurate with the power generation scale.
- It takes time to get the installation license and negotiate with the power company.
- It requires the acquisition of water rights.
It is realistic to restrict to home consumption, and even small-scale use.Night lights, security cameras, electric fences, sensors, and charging of smartphones. When it is positioned as an off-grid auxiliary power source, the use is seen.
Subsidy
Small hydropower generation has a support system of the state and municipality. But...Many of them assume the size of the enterprise, and the size of several dozens of W of the individual is excluded from the scope.There are many things.
| Renewable energy related to the Ministry of Environment and the Ministry of Economic and Industrial Affairs | The system changes from fiscal year to fiscal year. In this paper, we will discuss the scope of the project. |
|---|---|
| Ministry of Agriculture, Forestry and Fisheries (Use of waterways for agricultural purposes) | When using existing irrigation facilities such as land improvement areas. |
| Prefectures and municipalities have their own system. | There are municipalities that are active in small hydropower.Toyama, Nagano, Gifu, etc. |
Consult the department responsible for the environment in the municipality or prefecture and the renewable energy department in the prefecture.
What kind of stream would it be?
In summary, the more the following conditions are met, the more advantageous it is.
| Gap | It becomes more realistic when you get more than 20 meters.In the case of a water depth of less than 10m, it is difficult to obtain a good flow rate. |
|---|---|
| Flow in dry season | The minimum flow rate is more than 10 litres/second.It's stable if you have it. |
| Distance between water source and power source | The shorter, the better. The longer it takes, the more pipe costs and losses. |
| The size of the catchment area | The larger the catchment area upstream, the more stable the water volume is. |
| water rights | There is no downstream user or there is adjustment. |
| Access | It is possible to walk to the water source. It 's a direct link to maintenance. |
In the analysis system SAWA of this site, the width and slope of the catchment area are calculated.This is a material for measuring the potential of small hydropower.The actual flow and drop can only be measured on site.The analysis is only a tool for narrowing down the candidates.
Order before you start.
- Flow is measured in the dry season.You can do it with one bucket. It 's a big deal.
- The drop is measured.Difference in height between the place where water can be drawn and the place where the equipment can be placed
- Let's do the math.9.8 × flow × drop × 0.6
- We consider what can be done with the output.A few dozen watts is enough for lighting and sensors.
- Consult the department responsible for rivers in the municipality or village.Is it possible to draw water from that stream?
- Check downstream users.
- We consider whether maintenance management can be continued.This is perhaps the most important thing.
1 to 4.You can do it at no cost.And you can almost tell whether it will work with these four.